Categories
coLAB PAD
This project seeks to connect the user to the surrounding infrastructure through access to the LA river basin from the street by way of the undulating plinth topography. the plinth draws the revitalized landscape of the riverbed onto the roof and up through the coworking space by means of vertical farming. the coworking tower located high above the plinth takes on light and vast open views of elysian park, the downtown skyline and the river.